1. Completed attaching and wrangling of all the main switch panel wires. This panel will reman unattached for the time being, until I can get a pair of LED floodlights installed un the bottom side of it.
2. Secured the wires for the two sidewall spotlights inside the vertical spar channel.
3. Planned the installation of the alternate air control knob in the left gear tower.